A first article inspection (FAI) isn’t a measurement report. It’s a traceability report. The dimensions are 30% of it. Form 1 (part identification) and Form 2 (material/process identification) are where most FAIs fail.

The three forms

The most common rejection

Missing balloons. Form 3 must have every dimension and note from the drawing accounted for — including notes like “break sharp edges” or “remove burrs.” Skip one and the whole package comes back.

Use a balloon-numbering tool that exports directly to Form 3 column 5. Manually transcribing 200 dimensions is how transcription errors enter.

Leave a Reply

Your email address will not be published. Required fields are marked *